Desarrollo de un manual de buenas prácticas de manufactura (BPM) en la empresa “Helados el Canito” ubicado en la parroquia Guaytacama cantón Latacunga.

The objective of this Integrative Project was to develop a manual for the implementation of Good Manufacturing Practices (GMP) in the Ice Cream Company "El Canito" located in the Guaytacama Parish of the Latacunga Canton, to carry out this integrative project the Technical Regulations were...

Descrición completa

Gardado en:
Detalles Bibliográficos
Autor Principal: Sopalo Pucuji, Jefferson Enrique (author)
Formato: bachelorThesis
Idioma:spa
Publicado: 2022
Subjects:
Acceso en liña:http://repositorio.utc.edu.ec/handle/27000/8747
Tags: Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
Descripción
Summary:The objective of this Integrative Project was to develop a manual for the implementation of Good Manufacturing Practices (GMP) in the Ice Cream Company "El Canito" located in the Guaytacama Parish of the Latacunga Canton, to carry out this integrative project the Technical Regulations were taken as a reference Health for Processed Foods Resolution 067 Official Register Supplement 681 of 01/Feb/2016, Last modified on 11/May/2017 Status: Reformed No. ARCSA-DE-067-2015-GGG; bibliographic review and a checklist were used, which covered eight items, which are: facilities, equipment and utensils, hygienic manufacturing requirements, raw materials and supplies, production operations, packaging, labeling and packaging, storage, distribution and transportation, quality assurance and control. With the results obtained, we proceeded to prepare the documentation that will allow the improvement in the company's quality management system, all based on the standard operating procedures (SOP), sanitation standard operating procedures (SOP), specifically in parameters of BPM, for this reason, the documentation was proposed with measures that will reduce losses due to non-conforming products, to improve safety within the production process so that these improvements can be carried out, the cost determination of the implementation of the manual was carried out. BPM a total cost of $3,057.60 for facilities, infrastructure, hygienic manufacturing requirements and quality control assurance, so these are priorities for the company, which is why the project was of great help since the company will be at liberty to choose to implement them when it is economically viable.