Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the...
Saved in:
主要作者: | |
---|---|
格式: | bachelorThesis |
語言: | spa |
出版: |
2015
|
主題: | |
在線閱讀: | http://repositorio.utc.edu.ec/handle/27000/3599 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
成為第一個發表評論!