Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015

This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the...

Fuld beskrivelse

Saved in:
Bibliografiske detaljer
Hovedforfatter: Achote Andy, Edison Nicolay (author)
Format: bachelorThesis
Sprog:spa
Udgivet: 2015
Fag:
Online adgang:http://repositorio.utc.edu.ec/handle/27000/3599
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!