Evaluación del sistema de puesta a tierra de la línea de subtransmisión Ambato -Samanga y Samaga- Pillaro a 69 KV perteneciente a la Empresa Eléctrica Ambato para proponer alternativas que permitan mejorar el sistema.

The present investigation contains a diagnosis of the present situation of the systems of ground of the structures of the lines of Subtransmission to 69 KV. Ambato - Samanga and Samanga - Pillaro which has a length of 7,133 Km. For this work a collection of information of each one of the structures...

Full description

Saved in:
Bibliographic Details
Main Author: Chiliquinga Taipe, Johana Gabriela (author)
Other Authors: Guanoluisa, Luis Ernesto (author)
Format: bachelorThesis
Language:spa
Published: 2017
Subjects:
Online Access:http://repositorio.utc.edu.ec/handle/27000/4469
Tags: Add Tag
No Tags, Be the first to tag this record!