“Propuesta de rediseño del sistema contra incendios del Centro de Salud Tipo C Lasso, de la Dirección Distrital 05D01 Latacunga Salud, bajo la Norma NFPA”.
The present research project proposes to carry out the improvement of the fire system for Lasso Health Care Center, Type C of the health district direction 05D01 Latacunga, complying with the requirements stipulated in the NPFA 10, 14, 20 and 24 standard, with the objective of guaranteeing an optima...
Tallennettuna:
| Päätekijä: | |
|---|---|
| Muut tekijät: | |
| Aineistotyyppi: | bachelorThesis |
| Kieli: | spa |
| Julkaistu: |
2021
|
| Aiheet: | |
| Linkit: | http://repositorio.utc.edu.ec/handle/27000/8349 |
| Tagit: |
Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!
|
| Yhteenveto: | The present research project proposes to carry out the improvement of the fire system for Lasso Health Care Center, Type C of the health district direction 05D01 Latacunga, complying with the requirements stipulated in the NPFA 10, 14, 20 and 24 standard, with the objective of guaranteeing an optimal level of protection for the personnel who works, visitors and equipment that the aforementioned institution has, against the potential risks that a fire can cause. For the development of this proposal, the current state of the existing firefighting facilities was determined, the areas with the highest risk of fire and the furthest point, later the flow and pressure necessary for the firefighting system was determined, considering the criteria indicated in NFPA standards, which establish the minimum requirements for fire protection elements. As the main results, it was possible to determine that the Health Center has an Ordinary Fire Risk as established by the NFPA standard, Type A and C fires predominated in the analysis, so CO2 was selected for incipient fires and water for fires in development stage, it was also determined that the TDH of the pump has a pressure drop that is equal to 121 psi and a horizontal split case pump was selected whose nominal capacity is 250gpm @ 130psi and driven by a 30HP electric motor as At a minimum, it was additionally determined that the cost for the implementation is $ 32,500.00 (Thirty-two thousand five hundred North American Dollars). It was appreciated that the cost for the implementation would be lower, compared to the costs that may be generated in the event of a dangerous event with fire and avoiding the loss of human lives, equipment and others that may be affected by the fire. |
|---|