Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas
The study of times and movements in the process of construction of agricultural implements Moreano S.A. In which the process of construction of the towed dredges is analyzed, recording the times and movements of the production stages starting from the collection of the material, tracing, cutting, ar...
Shranjeno v:
| Glavni avtor: | |
|---|---|
| Format: | bachelorThesis |
| Jezik: | spa |
| Izdano: |
2017
|
| Teme: | |
| Online dostop: | http://repositorio.utc.edu.ec/handle/27000/4026 |
| Oznake: |
Označite
Brez oznak, prvi označite!
|
| _version_ | 1822282018947334144 |
|---|---|
| author | Chuqui Achig, Danys Wilfrido |
| author_facet | Chuqui Achig, Danys Wilfrido |
| author_role | author |
| collection | Repositorio Universidad Técnica de Cotopaxi |
| dc.contributor.none.fl_str_mv | Marín, Diana |
| dc.creator.none.fl_str_mv | Chuqui Achig, Danys Wilfrido |
| dc.date.none.fl_str_mv | 2017-10-25T16:34:37Z 2017-10-25T16:34:37Z 2017 |
| dc.format.none.fl_str_mv | 121 p. |
| dc.identifier.none.fl_str_mv | Chuqui Achig, Danys Wilfrido (2017). Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas. Ingeniería Industrial. UTC. Latacunga. 121 p. http://repositorio.utc.edu.ec/handle/27000/4026 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | LATACUNGA / UTC / 2017 |
| dc.rights.none.fl_str_mv | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | reponame:Repositorio Universidad Técnica de Cotopaxi instname:Universidad Técnica de Cotopaxi instacron:UTC |
| dc.subject.none.fl_str_mv | OPTIMIZACIÓN OPTIMIZACIÓN SITUACIÓN ACTUAL ESTUDIO |
| dc.title.none.fl_str_mv | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/bachelorThesis |
| description | The study of times and movements in the process of construction of agricultural implements Moreano S.A. In which the process of construction of the towed dredges is analyzed, recording the times and movements of the production stages starting from the collection of the material, tracing, cutting, armado, dotted, displacement, topped and inspection of the towed dredges. Identifying that in the construction of the base bed of the towed dredges is used more time in the stages of cutting and arming. The personnel working in these areas of work don´t know very well of the activities as they were identified at the time of conducting a previous survey, for the lifting of the times was done with the methods by timing with which they were established the time of each work area, obtaining a total of 26:08:27 of time employed, at a cost per drag of $ 2995.83. For the reduction of time and movement, a training was proposed for the personnel production of the company in regard to management of machinery and tools, through the training carried out, the times were reduced in the construction of agricultural towed dredges at 21:48:37 at a cost of $ 2939.28.... |
| eu_rights_str_mv | openAccess |
| format | bachelorThesis |
| id | UTC_6fc8ade494fa84e91331b838b0f45d2b |
| identifier_str_mv | Chuqui Achig, Danys Wilfrido (2017). Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas. Ingeniería Industrial. UTC. Latacunga. 121 p. |
| instacron_str | UTC |
| institution | UTC |
| instname_str | Universidad Técnica de Cotopaxi |
| language | spa |
| network_acronym_str | UTC |
| network_name_str | Repositorio Universidad Técnica de Cotopaxi |
| oai_identifier_str | oai:oai:repositorio.utc.edu.ec:27000:27000/4026 |
| publishDate | 2017 |
| publisher.none.fl_str_mv | LATACUNGA / UTC / 2017 |
| reponame_str | Repositorio Universidad Técnica de Cotopaxi |
| repository.mail.fl_str_mv | . |
| repository.name.fl_str_mv | Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi |
| repository_id_str | 0 |
| rights_invalid_str_mv | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ |
| spelling | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolasChuqui Achig, Danys WilfridoOPTIMIZACIÓNOPTIMIZACIÓNSITUACIÓN ACTUALESTUDIOThe study of times and movements in the process of construction of agricultural implements Moreano S.A. In which the process of construction of the towed dredges is analyzed, recording the times and movements of the production stages starting from the collection of the material, tracing, cutting, armado, dotted, displacement, topped and inspection of the towed dredges. Identifying that in the construction of the base bed of the towed dredges is used more time in the stages of cutting and arming. The personnel working in these areas of work don´t know very well of the activities as they were identified at the time of conducting a previous survey, for the lifting of the times was done with the methods by timing with which they were established the time of each work area, obtaining a total of 26:08:27 of time employed, at a cost per drag of $ 2995.83. For the reduction of time and movement, a training was proposed for the personnel production of the company in regard to management of machinery and tools, through the training carried out, the times were reduced in the construction of agricultural towed dredges at 21:48:37 at a cost of $ 2939.28....El estudio de tiempos y movimientos en el proceso de construcción de los implementos agrícolas Moreano S.A. en donde se analiza el proceso de construcción de las rastras determinado y registrando los tiempos, movimientos de las etapas de producción partiendo desde la recolección del material, trazado, corte, armado, punteado, transporte rematado e inspección de la rastras. Identificando que en la construcción de la cama baja de la rastra se utiliza más tiempo en las etapas de cortado y armado. El personal que labora en estas áreas de trabajo no conoce muy bien de las actividades como se logró identificar al momento de realizarles una encuesta previa, para el levantamiento de los tiempos se lo realizó con el método por cronometraje con lo que se establecieron los tiempo de cada área de trabajo, obteniendo un total de 26:08:27 de tiempo empleado, a un costo por rastra de $2995.83….LATACUNGA / UTC / 2017Marín, Diana2017-10-25T16:34:37Z2017-10-25T16:34:37Z2017info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis121 p.Chuqui Achig, Danys Wilfrido (2017). Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas. Ingeniería Industrial. UTC. Latacunga. 121 p.http://repositorio.utc.edu.ec/handle/27000/4026spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2017-10-26T08:00:48Zoai:oai:repositorio.utc.edu.ec:27000:27000/4026Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02025-01-26T03:43:46.634671Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue |
| spellingShingle | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas Chuqui Achig, Danys Wilfrido OPTIMIZACIÓN OPTIMIZACIÓN SITUACIÓN ACTUAL ESTUDIO |
| status_str | publishedVersion |
| title | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| title_full | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| title_fullStr | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| title_full_unstemmed | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| title_short | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| title_sort | Optimización de la producción, tiempos y movimientos en el proceso de construcción de implementos agrícolas |
| topic | OPTIMIZACIÓN OPTIMIZACIÓN SITUACIÓN ACTUAL ESTUDIO |
| url | http://repositorio.utc.edu.ec/handle/27000/4026 |