Diagnóstico energético del bloque 16 de repsol, mediante el uso de la norma iso 50001 en el año 2015. Propuesta de mejora de la eficiencia energética.

In the present work it is developed in Repsol, referring to artificial lift equipment they are EMPLOYEES to extract oil Equipment Water Injection Training which are used to inject formation water obtained from the separation process oil is, formation water and gas; and transportation of crude oil wh...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Portilla Bastidas, Franklin Fernando (author)
Format: masterThesis
Jezik:spa
Izdano: 2017
Teme:
Online dostop:http://repositorio.utc.edu.ec/handle/27000/6476
Oznake: Označite
Brez oznak, prvi označite!