Diagnóstico energético del bloque 16 de repsol, mediante el uso de la norma iso 50001 en el año 2015. Propuesta de mejora de la eficiencia energética.
In the present work it is developed in Repsol, referring to artificial lift equipment they are EMPLOYEES to extract oil Equipment Water Injection Training which are used to inject formation water obtained from the separation process oil is, formation water and gas; and transportation of crude oil wh...
Saved in:
| Main Author: | Portilla Bastidas, Franklin Fernando (author) |
|---|---|
| Format: | masterThesis |
| Language: | spa |
| Published: |
2017
|
| Subjects: | |
| Online Access: | http://repositorio.utc.edu.ec/handle/27000/6476 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Diagnóstico energético del bloque 16 de repsol, mediante el uso de la norma iso 50001 en el año 2015. Propuesta de mejora de la eficiencia energética.
by: Portilla Bastidas, Franklin Fernando
Published: (2017) -
Diagnóstico energético de las bombas centrifugas de 1500 hp del bloque 16 de repsol en el año 2013. Propuesta de un esquema de gestión continua de la eficiencia energética para optimizar la producción.
by: Veintimilla Bautista, Raúl
Published: (2017) -
Diagnóstico energético de las bombas centrifugas de 1500 hp del bloque 16 de repsol en el año 2013. Propuesta de un esquema de gestión continua de la eficiencia energética para optimizar la producción.
by: Veintimilla Bautista, Raúl
Published: (2017) -
Modelos de línea base energética en el sistema operacional del bloque 16 de Repsol para el período 2004-2012 para la norma ISO 50001: 2011.
by: Muso Chango, Carlos Germánico
Published: (2015) -
Modelos de línea base energética en el sistema operacional del bloque 16 de Repsol para el período 2004-2012 para la norma ISO 50001: 2011.
by: Muso Chango, Carlos Germánico
Published: (2015)