Implementación de una pico central hidroeléctrica mediante una turbina turgo de baja potencia en el barrio Guadalupe

Currently, microgeneration projects have been developed, especially in places that due to their geographical conditions prevent access to electricity supply by distribution companies, thus contributing to the use of renewable energy sources. In the present project, the house located in the Guadalupe...

Descrición completa

Gardado en:
Detalles Bibliográficos
Autor Principal: Tapia Villamarin, Antonio Agustin (author)
Formato: masterThesis
Idioma:spa
Publicado: 2022
Subjects:
Acceso en liña:http://repositorio.utc.edu.ec/handle/27000/9803
Tags: Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
Descripción
Summary:Currently, microgeneration projects have been developed, especially in places that due to their geographical conditions prevent access to electricity supply by distribution companies, thus contributing to the use of renewable energy sources. In the present project, the house located in the Guadalupe neighborhood, lacks the supply of electricity, which by installing an electricity generation system will benefit the users who reside in the house. The generation system is made up of a 25-liter catchment reservoir, a low-power Turgo-type turbine, a single-phase generator that helps convert mechanical energy to electrical energy and consists of a control system for parameter verification. system generation.