Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015

This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the...

Descrizione completa

Salvato in:
Dettagli Bibliografici
Autore principale: Achote Andy, Edison Nicolay (author)
Natura: bachelorThesis
Lingua:spa
Pubblicazione: 2015
Soggetti:
Accesso online:http://repositorio.utc.edu.ec/handle/27000/3599
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
_version_ 1822282016631029760
author Achote Andy, Edison Nicolay
author_facet Achote Andy, Edison Nicolay
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Proaño, Xavier
dc.creator.none.fl_str_mv Achote Andy, Edison Nicolay
dc.date.none.fl_str_mv 2015-08
2017-01-31T21:10:20Z
2017-01-31T21:10:20Z
dc.format.none.fl_str_mv 136 p.
dc.identifier.none.fl_str_mv Achote Andy, Edison Nicolay (2015). Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015. Ingeniería Eléctrica. UTC. Latacunga. 136 p.
http://repositorio.utc.edu.ec/handle/27000/3599
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv LATACUNGA / UTC / 2015
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv CONDUCTORES
ALUMBRADO
TABLEROS DE DISTRIBUCIÓN
CARGA ELÉCTRICA
dc.title.none.fl_str_mv Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the help of the simulator and the computer application SISDE geographic location "Global Mapper" connection is defined. Besides the analysis of the medium voltage network (with the data obtained from the run power flow) it was conducted to determine if the selected power transformer can respond to the power demand of the plant. In this study we used the simulator Neplan.
eu_rights_str_mv openAccess
format bachelorThesis
id UTC_7e94a41a4459ef5ead136cfd7b0e8307
identifier_str_mv Achote Andy, Edison Nicolay (2015). Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015. Ingeniería Eléctrica. UTC. Latacunga. 136 p.
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:oai:repositorio.utc.edu.ec:27000:27000/3599
publishDate 2015
publisher.none.fl_str_mv LATACUNGA / UTC / 2015
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015Achote Andy, Edison NicolayCONDUCTORESALUMBRADOTABLEROS DE DISTRIBUCIÓNCARGA ELÉCTRICAThis research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the help of the simulator and the computer application SISDE geographic location "Global Mapper" connection is defined. Besides the analysis of the medium voltage network (with the data obtained from the run power flow) it was conducted to determine if the selected power transformer can respond to the power demand of the plant. In this study we used the simulator Neplan.El presente trabajo investigativo describe el estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la Corporación Kallary, ubicada en la provincia de Napo sector Tena, en el año 2015. Se define el lugar de conexión más apropiado del sistema interconectado que pasa por Tena para proyectar la línea de alimentación de la empresa con la ayuda del simulador SISDE y la aplicación informática de localización geográfica “Global Mapper”. Además se realizó el análisis de la red de medio voltaje (con los datos obtenidos de la corrida de flujos de potencia) para determinar si la potencia del transformador seleccionado, puede dar respuesta a la demanda de potencia de la planta. En este estudio fue utilizado el simulador Neplan.LATACUNGA / UTC / 2015Proaño, Xavier2017-01-31T21:10:20Z2017-01-31T21:10:20Z2015-08info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis136 p.Achote Andy, Edison Nicolay (2015). Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015. Ingeniería Eléctrica. UTC. Latacunga. 136 p.http://repositorio.utc.edu.ec/handle/27000/3599spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2017-02-02T08:02:11Zoai:oai:repositorio.utc.edu.ec:27000:27000/3599Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02025-01-26T03:43:38.434546Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
Achote Andy, Edison Nicolay
CONDUCTORES
ALUMBRADO
TABLEROS DE DISTRIBUCIÓN
CARGA ELÉCTRICA
status_str publishedVersion
title Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
title_full Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
title_fullStr Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
title_full_unstemmed Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
title_short Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
title_sort Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015
topic CONDUCTORES
ALUMBRADO
TABLEROS DE DISTRIBUCIÓN
CARGA ELÉCTRICA
url http://repositorio.utc.edu.ec/handle/27000/3599