Auditoría a la gestión de calidad en la empresa “construcciones ulloa” ubicado en la parroquia Ignacio flores del Canton latacunga provincia de cotopaxi, al periodo del 01 de enero al 31 de diciembre 2012
This research was conducted with the purpose of conducting an audit quality management processes applied Ulloa Construcciones SA, based on ISO 9001 with the aim of knowing the quality management in the company, which was made based on a literature theory to the procedure of an audit of quality manag...
Gardado en:
| Autor Principal: | |
|---|---|
| Formato: | bachelorThesis |
| Idioma: | spa |
| Publicado: |
2015
|
| Subjects: | |
| Acceso en liña: | http://repositorio.utc.edu.ec/handle/27000/2145 |
| Tags: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
| Summary: | This research was conducted with the purpose of conducting an audit quality management processes applied Ulloa Construcciones SA, based on ISO 9001 with the aim of knowing the quality management in the company, which was made based on a literature theory to the procedure of an audit of quality management. It should be noted that internal and external aspects of the organization in which the strengths, weaknesses, opportunities and threats of the organization was determined identified whose purpose is to mitigate the risks to which it is exposed, which affects productivity of the same…. |
|---|