Análisis de calidad de energía eléctrica de la empresa florícola agrorab cia ltda. ubicada en el cantón Pujilí.
This research work was carried out in the AGRORAB TDA. Flower-growing company, which is dedicated to the production of roses, it is located in the Cotopaxi Province, Pujili Canton; the project has the purpose of improving the quality of the energy supply according to the norms stipulated by ARCONEL...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://repositorio.utc.edu.ec/handle/27000/5353 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | This research work was carried out in the AGRORAB TDA. Flower-growing company, which is dedicated to the production of roses, it is located in the Cotopaxi Province, Pujili Canton; the project has the purpose of improving the quality of the energy supply according to the norms stipulated by ARCONEL 053/18 regulation. In the project, field research and bibliographical research were used, in order to elaborate the proposed theme; in the flower-growing company, a Fluke 435 load analyzer was installed in the distribution board in which the respective analysis of the measurements was obtained after that, the researchers proceeded to the analysis of the data, subsequently a one-line diagram was made, with the use of the EASY POWER software, the load flow analysis was performed to determine the voltage drops, power losses, power flows, power factor and chargeability of the electrical system. Likewise, a problem analysis was carried out in AGRORAB LTDA. Once the analysis was done, it is proposed to provide solutions to reduce the penalization costs due to the low power factor that the Electricity Company of Cotopaxi (ELEPCO) monthly invoiced, in the same way, to improve the pollution troubles that is produced by the non-linear loads of the flower-growing company. Researchers proceed to propose a technical - economic proposal at the end of this project, and they add conclusions and recommendations as well. |
|---|