Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015
The “Empresa Eléctrica Ambato Regional Centro Norte S.A.” with the goal of abide the dispositions of the Ministry of Electricity and Renewable Energy about the replacement of overhead networks to underground networks, allows to perform the underground network designs in the historic centers of its c...
-д хадгалсан:
| Үндсэн зохиолч: | |
|---|---|
| Формат: | bachelorThesis |
| Хэл сонгох: | spa |
| Хэвлэсэн: |
2016
|
| Нөхцлүүд: | |
| Онлайн хандалт: | http://repositorio.utc.edu.ec/handle/27000/2149 |
| Шошгууд: |
Шошго нэмэх
Шошго байхгүй, Энэхүү баримтыг шошголох эхний хүн болох!
|
| _version_ | 1863503436316672000 |
|---|---|
| author | Curipoma Díaz, Luis Ricardo |
| author_facet | Curipoma Díaz, Luis Ricardo |
| author_role | author |
| collection | Repositorio Universidad Técnica de Cotopaxi |
| dc.contributor.none.fl_str_mv | Pallasco, Susana |
| dc.creator.none.fl_str_mv | Curipoma Díaz, Luis Ricardo |
| dc.date.none.fl_str_mv | 2016-07-26T13:55:36Z 2016-07-26T13:55:36Z 2016-03 |
| dc.format.none.fl_str_mv | 174 p. application/pdf |
| dc.identifier.none.fl_str_mv | Curipoma Díaz, Luis Ricardo (2016). Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015. Ingeniería Eléctrica. UTC. Latacunga. 174 p. http://repositorio.utc.edu.ec/handle/27000/2149 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | LATACUNGA / UTC / 2016 |
| dc.rights.none.fl_str_mv | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | reponame:Repositorio Universidad Técnica de Cotopaxi instname:Universidad Técnica de Cotopaxi instacron:UTC |
| dc.subject.none.fl_str_mv | SISTEMA ELÉCTRICO CONSUMO DE ENERGÍA RED SUBTERRÁNEA CARGABILIDAD DE CONDUCTORES |
| dc.title.none.fl_str_mv | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/bachelorThesis |
| description | The “Empresa Eléctrica Ambato Regional Centro Norte S.A.” with the goal of abide the dispositions of the Ministry of Electricity and Renewable Energy about the replacement of overhead networks to underground networks, allows to perform the underground network designs in the historic centers of its concession area. The present work determines the necessary parameters to perform the underground network design, through the review of the actual situation of the electric system, of the “Canton Tisaleo” center. The process of analysis of the average power consumption of the users, the application of the REA method to determine the coincident maximum demand that will be project for a growth factor…. |
| eu_rights_str_mv | openAccess |
| format | bachelorThesis |
| id | UTC_cd206f8bde294c0819e61a9ac33153bd |
| identifier_str_mv | Curipoma Díaz, Luis Ricardo (2016). Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015. Ingeniería Eléctrica. UTC. Latacunga. 174 p. |
| instacron_str | UTC |
| institution | UTC |
| instname_str | Universidad Técnica de Cotopaxi |
| language | spa |
| network_acronym_str | UTC |
| network_name_str | Repositorio Universidad Técnica de Cotopaxi |
| oai_identifier_str | oai:repositorio.utc.edu.ec:27000/2149 |
| publishDate | 2016 |
| publisher.none.fl_str_mv | LATACUNGA / UTC / 2016 |
| reponame_str | Repositorio Universidad Técnica de Cotopaxi |
| repository.mail.fl_str_mv | . |
| repository.name.fl_str_mv | Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi |
| repository_id_str | 0 |
| rights_invalid_str_mv | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ |
| spelling | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015Curipoma Díaz, Luis RicardoSISTEMA ELÉCTRICOCONSUMO DE ENERGÍARED SUBTERRÁNEACARGABILIDAD DE CONDUCTORESThe “Empresa Eléctrica Ambato Regional Centro Norte S.A.” with the goal of abide the dispositions of the Ministry of Electricity and Renewable Energy about the replacement of overhead networks to underground networks, allows to perform the underground network designs in the historic centers of its concession area. The present work determines the necessary parameters to perform the underground network design, through the review of the actual situation of the electric system, of the “Canton Tisaleo” center. The process of analysis of the average power consumption of the users, the application of the REA method to determine the coincident maximum demand that will be project for a growth factor….La Empresa Eléctrica Ambato Regional Centro Norte S.A. con el fin de acatar las disposiciones del Ministerio de Electricidad y Energía Renovable sobre el reemplazo de redes aéreas a subterráneas, permite realizar los diseños de las redes subterráneas en los centros históricos de su área de concesión. El presente trabajo determina los parámetros necesarios para realizar el diseño de la red eléctrica subterránea, mediante al análisis de la situación actual del sistema eléctrico, para el centro del Cantón Tisaleo. Se presenta en este trabajo el procedimiento de análisis del consumo promedio de energía de los usuarios, aplicación del método REA para determinar la Demanda Máxima Coincidente la cual será proyectada por un factor de crecimiento….LATACUNGA / UTC / 2016Pallasco, Susana2016-07-26T13:55:36Z2016-07-26T13:55:36Z2016-03info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis174 p.application/pdfCuripoma Díaz, Luis Ricardo (2016). Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015. Ingeniería Eléctrica. UTC. Latacunga. 174 p.http://repositorio.utc.edu.ec/handle/27000/2149spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2016-07-27T08:00:11Zoai:repositorio.utc.edu.ec:27000/2149Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02026-04-26T03:38:42.266856Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue |
| spellingShingle | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 Curipoma Díaz, Luis Ricardo SISTEMA ELÉCTRICO CONSUMO DE ENERGÍA RED SUBTERRÁNEA CARGABILIDAD DE CONDUCTORES |
| status_str | publishedVersion |
| title | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| title_full | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| title_fullStr | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| title_full_unstemmed | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| title_short | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| title_sort | Diseño y simulación del sistema eléctrico de la red subterránea con la aplicación de nuevos criterios técnicos – económicos impulsados por la Empresa Eléctrica Ambato Regional Centro Norte S.A. en el centro del cantón Tisaleo provincia de Tungurahua, periodo 2015 |
| topic | SISTEMA ELÉCTRICO CONSUMO DE ENERGÍA RED SUBTERRÁNEA CARGABILIDAD DE CONDUCTORES |
| url | http://repositorio.utc.edu.ec/handle/27000/2149 |