Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016

The following research work was developed with the purpose of sizing and purpose a circuit breaker with its respective characteristics and the necessary parameters in EP CELEC Pucara Hydroelectric Business Unit Hidroagoyan to 13.8 kV generating unit U1. This work was done with the use of surveys as...

Deskribapen osoa

Gorde:
Xehetasun bibliografikoak
Egile nagusia: Paucar Fonseca, Jairo Fabricio (author)
Beste egile batzuk: Paucar Fonseca, Edison David (author)
Formatua: bachelorThesis
Hizkuntza:spa
Argitaratua: 2016
Gaiak:
Sarrera elektronikoa:http://repositorio.utc.edu.ec/handle/27000/2153
Etiketak: Etiketa erantsi
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
_version_ 1863503499677925376
author Paucar Fonseca, Jairo Fabricio
author2 Paucar Fonseca, Edison David
author2_role author
author_facet Paucar Fonseca, Jairo Fabricio
Paucar Fonseca, Edison David
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Quispe Toapanta, Vicente Javier
dc.creator.none.fl_str_mv Paucar Fonseca, Jairo Fabricio
Paucar Fonseca, Edison David
dc.date.none.fl_str_mv 2016-07-26T14:16:35Z
2016-07-26T14:16:35Z
2016
dc.format.none.fl_str_mv 141 p.
application/pdf
dc.identifier.none.fl_str_mv Paucar Fonseca, Jairo Fabricio. Paucar Fonseca, Edison David (2016). Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016. Ingeniería Eléctrica. UTC. Latacunga. 141 p.
http://repositorio.utc.edu.ec/handle/27000/2153
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv LATACUNGA / UTC / 2016
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv ANÁLISIS DE CORRIENTES
CORTOCIRCUITO
INTERRUPTOR DE POTENCIA
CELEC E.P.
dc.title.none.fl_str_mv Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The following research work was developed with the purpose of sizing and purpose a circuit breaker with its respective characteristics and the necessary parameters in EP CELEC Pucara Hydroelectric Business Unit Hidroagoyan to 13.8 kV generating unit U1. This work was done with the use of surveys as a research tool to collect real time information on current operating conditions which is working to join the National Interconnected System (SNI) to prove the formulated hypothesis. This work used ETAP 12.6.0 software as a standardized rules guide IEC (International Electrotechnical Commission) for the specifications of the electric flow under regular and irregular conditions….
eu_rights_str_mv openAccess
format bachelorThesis
id UTC_ddc357ac3a9eefe23ce8b67106a6cb38
identifier_str_mv Paucar Fonseca, Jairo Fabricio. Paucar Fonseca, Edison David (2016). Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016. Ingeniería Eléctrica. UTC. Latacunga. 141 p.
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:repositorio.utc.edu.ec:27000/2153
publishDate 2016
publisher.none.fl_str_mv LATACUNGA / UTC / 2016
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016Paucar Fonseca, Jairo FabricioPaucar Fonseca, Edison DavidANÁLISIS DE CORRIENTESCORTOCIRCUITOINTERRUPTOR DE POTENCIACELEC E.P.The following research work was developed with the purpose of sizing and purpose a circuit breaker with its respective characteristics and the necessary parameters in EP CELEC Pucara Hydroelectric Business Unit Hidroagoyan to 13.8 kV generating unit U1. This work was done with the use of surveys as a research tool to collect real time information on current operating conditions which is working to join the National Interconnected System (SNI) to prove the formulated hypothesis. This work used ETAP 12.6.0 software as a standardized rules guide IEC (International Electrotechnical Commission) for the specifications of the electric flow under regular and irregular conditions….El presente trabajo de investigación se elaboró con la finalidad de dimensionar y proponer un disyuntor de potencia con sus respectivas características y parámetros eléctricos en la Central Hidroeléctrica Pucará CELEC E.P Unidad de Negocio Hidroagoyan a 13.8kV Unidad Generadora U1, con la utilización de encuestas como herramienta de investigación para la recolección de información en tiempo real sobre las condiciones actuales de operación que está trabajando para incorporarse al Sistema Nacional Interconectado (SIN), comprobamos la hipótesis formada….LATACUNGA / UTC / 2016Quispe Toapanta, Vicente Javier2016-07-26T14:16:35Z2016-07-26T14:16:35Z2016info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis141 p.application/pdfPaucar Fonseca, Jairo Fabricio. Paucar Fonseca, Edison David (2016). Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016. Ingeniería Eléctrica. UTC. Latacunga. 141 p.http://repositorio.utc.edu.ec/handle/27000/2153spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2016-07-27T08:00:22Zoai:repositorio.utc.edu.ec:27000/2153Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02026-04-26T03:41:48.054286Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
Paucar Fonseca, Jairo Fabricio
ANÁLISIS DE CORRIENTES
CORTOCIRCUITO
INTERRUPTOR DE POTENCIA
CELEC E.P.
status_str publishedVersion
title Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
title_full Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
title_fullStr Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
title_full_unstemmed Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
title_short Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
title_sort Análisis de corrientes de cortocircuito para el dimensionamiento de un interruptor de potencia a 13.8 kv entre la unidad generadora u1 y el transformador de potencia de 40 mva a 13.8/138 kv en la central hidroeléctrica Pucará CELEC E.P unidad de negocio hidroagoyan en el periodo 2015 - 2016
topic ANÁLISIS DE CORRIENTES
CORTOCIRCUITO
INTERRUPTOR DE POTENCIA
CELEC E.P.
url http://repositorio.utc.edu.ec/handle/27000/2153