Implementación de un sistema de generación Híbrido Eólico - Solar en la Hacienda Hospitalillo de la Empresa Novopan del Ecuador.

The lack of electrical energy in the sector due to the geographical situation allowed the researchers to carry out the present project that has as objective the implementation of a wind - solar hybrid generation system using renewable energies, allowing the transformation of this into electrical ene...

Volledige beschrijving

Bewaard in:
Bibliografische gegevens
Hoofdauteur: Cotacachi Cabezas, Whitney Tatiana (author)
Andere auteurs: Sanchez Moreno, Hugo Fernando (author)
Formaat: bachelorThesis
Taal:spa
Gepubliceerd in: 2018
Onderwerpen:
Online toegang:http://repositorio.utc.edu.ec/handle/27000/4506
Tags: Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
Omschrijving
Samenvatting:The lack of electrical energy in the sector due to the geographical situation allowed the researchers to carry out the present project that has as objective the implementation of a wind - solar hybrid generation system using renewable energies, allowing the transformation of this into electrical energy. which supplies the energy demand in a continuous manner that is needed in the Hospitalillo Hospital, for its realization the scientific content is backed up on the basis of a reliable theoretical foundation. At the beginning of the study, specific data of the wind speed was taken, by means of a meteorological station, which gave information every day, of wind gusts, turbulence that exists in the place, the minimum speed is 3.92 m/s the maximum speed is 22 m/s, in turn data was taken from solar radiation having a minimum value of 234W/m^2 and a maximum value of 1800W/m^2, it was obtained through of an instrument known as pyranometer, complying with the characteristics for electric generation. According to the information obtained and the calculation made of the energy demand, it was concluded that a wind turbine with a power of 750 W horizontal type ZONHAN model is needed together with two mono crystalline solar panels each with a power of 150 W, an inverter of 110 volts alternate of 1500 W of power and 2 batteries of 30H102L, which help the charging system. With these elements, the needs of the electrical generation system of the Hospitalillo Hacienda are met, the entire implementation will be carried out in a tower 12 meters high according to (C.Figueredo, 2014), taking advantage of the renewable energy resources.