Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015

In this project the development and implementation of the management system and scheduled maintenance of technological and industrial equipment are detailed, which was developed for the maintenance department of the detailed CIAUTO assembly plant. The system will help to keep track of digital format...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Gutiérrez Jácome, Darío (author)
Formato: bachelorThesis
Idioma:spa
Publicado em: 2016
Assuntos:
Acesso em linha:http://repositorio.utc.edu.ec/handle/27000/2045
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
_version_ 1822282008221450240
author Gutiérrez Jácome, Darío
author_facet Gutiérrez Jácome, Darío
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Corrales, Segundo
dc.creator.none.fl_str_mv Gutiérrez Jácome, Darío
dc.date.none.fl_str_mv 2016-07-12T17:35:14Z
2016-07-12T17:35:14Z
2016
dc.format.none.fl_str_mv 149 p.
dc.identifier.none.fl_str_mv Gutiérrez Jácome, Darío (2016). Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015. Unidad Académica de Ciencias de la Ingeniería y Aplicadas. UTC. Latacunga. 149 p.
http://repositorio.utc.edu.ec/handle/27000/2045
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv LATACUNGA / UTC / 2016
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv SISTEMA DE GESTIÓN
EQUIPOS TECNOLÓGICOS
METODOLOGÍA SCRUM
TECNOLOGÍA
dc.title.none.fl_str_mv Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description In this project the development and implementation of the management system and scheduled maintenance of technological and industrial equipment are detailed, which was developed for the maintenance department of the detailed CIAUTO assembly plant. The system will help to keep track of digital formats such as documents, records, plans and instructions that allow the name of the control processes of planning activities in the maintenance department. It has been found that industrial computers can be monitored regularly, and minimize failures in several ways, with the use of a PostgreSQL database and Java programming language to be tools for SCRUM methodology, the same methodology of agile software development allows the project to add new functional requirements in each interaction; for the access to the system, a username and password for each department is used, the user can access to all ROOT system modules; the system is divided into two modules: Module maintenance and module systems, the modules are independent….
eu_rights_str_mv openAccess
format bachelorThesis
id UTC_e952e2dacc8ecb110f5b3fb1a7611ca2
identifier_str_mv Gutiérrez Jácome, Darío (2016). Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015. Unidad Académica de Ciencias de la Ingeniería y Aplicadas. UTC. Latacunga. 149 p.
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:oai:repositorio.utc.edu.ec:27000:27000/2045
publishDate 2016
publisher.none.fl_str_mv LATACUNGA / UTC / 2016
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015Gutiérrez Jácome, DaríoSISTEMA DE GESTIÓNEQUIPOS TECNOLÓGICOSMETODOLOGÍA SCRUMTECNOLOGÍAIn this project the development and implementation of the management system and scheduled maintenance of technological and industrial equipment are detailed, which was developed for the maintenance department of the detailed CIAUTO assembly plant. The system will help to keep track of digital formats such as documents, records, plans and instructions that allow the name of the control processes of planning activities in the maintenance department. It has been found that industrial computers can be monitored regularly, and minimize failures in several ways, with the use of a PostgreSQL database and Java programming language to be tools for SCRUM methodology, the same methodology of agile software development allows the project to add new functional requirements in each interaction; for the access to the system, a username and password for each department is used, the user can access to all ROOT system modules; the system is divided into two modules: Module maintenance and module systems, the modules are independent….En el presente proyecto de tesis se detalla el desarrollo e implementación del Sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, el cual fue desarrollado para el departamento de mantenimiento de la planta ensambladora CIAUTO. El sistema ayudara a llevar un control de documentos digitales tales como formatos, registros, planes e instructivos que permiten la denominación de los procesos de control de la planificación de actividades en el departamento de mantenimiento. Se ha detectado que los equipos industriales podrán ser controlados periódicamente, y minimizar las fallas en varias formas, con la utilización de una base de datos en PostgresSQL y lenguaje de programación JAVA que serán las herramientas para la metodología SCRUM, la misma metodología de desarrollo ágil de software permite que el proyecto pueda insertar nuevos requerimientos funcionales en cada interacción; para el acceso al sistema se utilizara un usuario y contraseña para cada departamentos, el usuario que podrá acceder a todos los módulos del sistema es ROOT; el sistema estará divido en 2 módulos: módulo de mantenimiento y módulo de sistemas, los módulos son independientes….LATACUNGA / UTC / 2016Corrales, Segundo2016-07-12T17:35:14Z2016-07-12T17:35:14Z2016info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis149 p.Gutiérrez Jácome, Darío (2016). Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015. Unidad Académica de Ciencias de la Ingeniería y Aplicadas. UTC. Latacunga. 149 p.http://repositorio.utc.edu.ec/handle/27000/2045spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2023-09-08T17:12:48Zoai:oai:repositorio.utc.edu.ec:27000:27000/2045Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02025-01-26T03:43:08.892399Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
Gutiérrez Jácome, Darío
SISTEMA DE GESTIÓN
EQUIPOS TECNOLÓGICOS
METODOLOGÍA SCRUM
TECNOLOGÍA
status_str publishedVersion
title Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
title_full Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
title_fullStr Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
title_full_unstemmed Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
title_short Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
title_sort Implementación de un sistema de gestión y mantenimiento programado de equipos tecnológicos e industriales, aplicando la metodología scrum, para el departamento de mantenimiento de la planta ensambladora ciauto, en la ciudad de Ambato, durante el periodo 2014 - 2015
topic SISTEMA DE GESTIÓN
EQUIPOS TECNOLÓGICOS
METODOLOGÍA SCRUM
TECNOLOGÍA
url http://repositorio.utc.edu.ec/handle/27000/2045