Coordinación de protecciones del alimentador No 3 de la S/E La Maná a 13,8 kV para Elepco S.A.
The present titling work is based on the protection coordination study of the FEEDER No 3 OF THE S/E LA MANÁ AT 13.8 kV FOR ELEPCO S.A, applying the methodology of selectivity, speed and reliability in the face of a failure event. electrical. The protection coordination study consists of determining...
Uloženo v:
| Hlavní autor: | |
|---|---|
| Další autoři: | |
| Médium: | masterThesis |
| Jazyk: | spa |
| Vydáno: |
2022
|
| Témata: | |
| On-line přístup: | http://repositorio.utc.edu.ec/handle/27000/8861 |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | The present titling work is based on the protection coordination study of the FEEDER No 3 OF THE S/E LA MANÁ AT 13.8 kV FOR ELEPCO S.A, applying the methodology of selectivity, speed and reliability in the face of a failure event. electrical. The protection coordination study consists of determining the appropriate protection devices and their corresponding settings for adequate and selective operation in the face of any fault condition, based on the nominal powers, , of all the distribution transformers, the monthly consumption of energy of each client, kWh, and the network configuration scheme, the CYMDIST computer program coincides with the load distribution criterion. The described load distribution techniques consider a single real measurement of the energy meter installed at the head of the main feeder, not so, if there were more than one real measurement point properly distributed in the network, CYME has the flexibility to include said measurements in your algorithm. All the data provided by ELEPCO S.A, was used as input parameters for the algorithm in CYME to execute the distribution, and the load flow study. |
|---|