Coordinación de protecciones en la central hidroeléctrica Río Verde Chico

In this research work carried out at the Río Verde Chico Hydroelectric Power Plant, the current operating conditions are analyzed, simulating different scenarios in which the plant can work, in addition to simulating load flows, short-circuit currents, and the operation of the protection equipment w...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Molina Salazar, Carlos Andrés (author)
Format: masterThesis
Jezik:spa
Izdano: 2024
Teme:
Online dostop:http://repositorio.utc.edu.ec/handle/27000/12198
Oznake: Označite
Brez oznak, prvi označite!
_version_ 1862869148107800576
author Molina Salazar, Carlos Andrés
author_facet Molina Salazar, Carlos Andrés
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Proaño Maldonado, Xavier Alfonso
dc.creator.none.fl_str_mv Molina Salazar, Carlos Andrés
dc.date.none.fl_str_mv 2024-03-13T15:14:39Z
2024-03-13T15:14:39Z
2024-02
dc.format.none.fl_str_mv 168 páginas
application/pdf
dc.identifier.none.fl_str_mv Molina Salazar Carlos Andrés (2024); Coordinación de protecciones en la central hidroeléctrica Río Verde Chico. UTC. Latacunga. 168 p.
MUTC-001837
http://repositorio.utc.edu.ec/handle/27000/12198
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Ecuador: Latacunga: Universidad Técnica de Cotopaxi (UTC)
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv CENTRAL HIDROELÉCTRICA
COORDINACIÓN DE PROTECCIONES
PROTECCIÓN DE SOBRECORRIENTE
ELECTRICIDAD
dc.title.none.fl_str_mv Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/masterThesis
description In this research work carried out at the Río Verde Chico Hydroelectric Power Plant, the current operating conditions are analyzed, simulating different scenarios in which the plant can work, in addition to simulating load flows, short-circuit currents, and the operation of the protection equipment with the current settings, In this way it was possible to know how the protection system is working, where it was possible to identify problems of misconfigured protections in the IEDs, which does not allow to have a selective protection and there are erroneous trips in the transmission lines, especially when it works in mesh, this means when it is connected to the Baños and Agoyán substation. . With this background, in chapter 3, it is proposed to make new adjustments to the protections, specifically in the protection lines, to solve in the medium and long term the problems identified, for the line distance protection zone 2 is eliminated because being short lines it is not necessary to have enabled, from the simulations performed, when there are faults at more than 80% of the transmission line the protections of the substation of arrival will act, which is the correct way to work; For the overcurrent protection, the non-directional characteristic was changed to directional in order to avoid erroneous tripping and the power plant can work in mesh; additionally, a load flow simulation was performed considering a 5% growth in demand, where it was determined that the current transformers of the lines are not designed to support the nominal current of the line when it works at full load; And for the generators, it is proposed to activate the ANSI 51V voltage controlled overcurrent protection because it is the typical and recommended recommendation for electric generators, thus guaranteeing that the protection will act in case of any unbalance in normal operation. With these new settings in the IEDs and after performing all the necessary simulations in all possible operating scenarios, it was possible to obtain a selective, reliable and fast coordination of protections against system failures.
eu_rights_str_mv openAccess
format masterThesis
id UTC_fa0b68388426dff83156f174e34cd678
identifier_str_mv Molina Salazar Carlos Andrés (2024); Coordinación de protecciones en la central hidroeléctrica Río Verde Chico. UTC. Latacunga. 168 p.
MUTC-001837
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:repositorio.utc.edu.ec:27000/12198
publishDate 2024
publisher.none.fl_str_mv Ecuador: Latacunga: Universidad Técnica de Cotopaxi (UTC)
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Coordinación de protecciones en la central hidroeléctrica Río Verde ChicoMolina Salazar, Carlos AndrésCENTRAL HIDROELÉCTRICACOORDINACIÓN DE PROTECCIONESPROTECCIÓN DE SOBRECORRIENTEELECTRICIDADIn this research work carried out at the Río Verde Chico Hydroelectric Power Plant, the current operating conditions are analyzed, simulating different scenarios in which the plant can work, in addition to simulating load flows, short-circuit currents, and the operation of the protection equipment with the current settings, In this way it was possible to know how the protection system is working, where it was possible to identify problems of misconfigured protections in the IEDs, which does not allow to have a selective protection and there are erroneous trips in the transmission lines, especially when it works in mesh, this means when it is connected to the Baños and Agoyán substation. . With this background, in chapter 3, it is proposed to make new adjustments to the protections, specifically in the protection lines, to solve in the medium and long term the problems identified, for the line distance protection zone 2 is eliminated because being short lines it is not necessary to have enabled, from the simulations performed, when there are faults at more than 80% of the transmission line the protections of the substation of arrival will act, which is the correct way to work; For the overcurrent protection, the non-directional characteristic was changed to directional in order to avoid erroneous tripping and the power plant can work in mesh; additionally, a load flow simulation was performed considering a 5% growth in demand, where it was determined that the current transformers of the lines are not designed to support the nominal current of the line when it works at full load; And for the generators, it is proposed to activate the ANSI 51V voltage controlled overcurrent protection because it is the typical and recommended recommendation for electric generators, thus guaranteeing that the protection will act in case of any unbalance in normal operation. With these new settings in the IEDs and after performing all the necessary simulations in all possible operating scenarios, it was possible to obtain a selective, reliable and fast coordination of protections against system failures.En el presente trabajo de investigación realizado en la Central Hidroeléctrica Río Verde Chico, se analizan las condiciones actuales de operación, simulando diferentes escenarios en las que la central puede trabajar, adicional se simuló flujos de carga, corrientes de cortocircuito, y la operación de los equipos de protección con los ajustes actuales, de esta manera se pudo conocer como está trabajando el sistema de protecciones, donde se pudo identificar problemas de protecciones mal configuradas en los IEDs lo que no permite tener una protección selectiva y se tiene disparos erróneos en las líneas de transmisión en especial cuando trabaja en malla, esto quiere decir cuando se conecta a la sub estación Baños y Agoyán.. Con estos antecedentes, en el capítulo 3, se propone realizar nuevos ajustes a las protecciones, específicamente en las líneas de protección, para solventar a mediano y largo plazo los problemas identificados, para la protección de distancia de líneas se elimina la zona 2 debido a que al ser líneas cortas no es necesario tener habilitada, de las simulaciones realizadas, cuando existan fallas a más del 80% de la línea de transmisión van a actuar las protecciones de la subestación de llegada que es la manera correcta de trabajar; para la protección de sobre corriente se cambió la característica no direccional, por direccional para evitar disparos erróneos y la central pueda trabajar en malla, adicionalmente se realizó una simulación de flujo de carga considerando un crecimiento del 5% de la demanda, donde se pudo determinar que los trasformadores de corriente de las líneas no están diseñados para soportar la corriente nominal de la línea cuando trabaje a plena carga; y para los generadores se propone activar la protección sobrecorriente controlada por voltaje ANSI 51V debido a que es la recomendación típica y recomendada para generadores eléctricos, así se puede garantizar que la protección actúe ante cualquier desbalance en operación normal. Con estos nuevos ajustes en los IEDs y después de realizar todas las simulaciones necesarias en todos los escenarios posibles de operación se pudo obtener una coordinación de protecciones selectiva, confiable y rápida frente a fallas en el sistema.Ecuador: Latacunga: Universidad Técnica de Cotopaxi (UTC)Proaño Maldonado, Xavier Alfonso2024-03-13T15:14:39Z2024-03-13T15:14:39Z2024-02info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis168 páginasapplication/pdfMolina Salazar Carlos Andrés (2024); Coordinación de protecciones en la central hidroeléctrica Río Verde Chico. UTC. Latacunga. 168 p.MUTC-001837http://repositorio.utc.edu.ec/handle/27000/12198spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2024-03-13T15:16:38Zoai:repositorio.utc.edu.ec:27000/12198Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02026-04-19T03:39:10.926736Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
Molina Salazar, Carlos Andrés
CENTRAL HIDROELÉCTRICA
COORDINACIÓN DE PROTECCIONES
PROTECCIÓN DE SOBRECORRIENTE
ELECTRICIDAD
status_str publishedVersion
title Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
title_full Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
title_fullStr Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
title_full_unstemmed Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
title_short Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
title_sort Coordinación de protecciones en la central hidroeléctrica Río Verde Chico
topic CENTRAL HIDROELÉCTRICA
COORDINACIÓN DE PROTECCIONES
PROTECCIÓN DE SOBRECORRIENTE
ELECTRICIDAD
url http://repositorio.utc.edu.ec/handle/27000/12198