Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.

Assess the impact of a system of quality management in the construction company Razconsa CA, it has determined based on the costs of construction of sanitation, which allow to determine those responsible for indicators to assess parameters field parameters that can be corrected as they happen everyd...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Córdova Montaño, Juan Carlos (author)
Formato: masterThesis
Lenguaje:spa
Publicado: 2016
Materias:
Acceso en línea:http://repositorio.uteq.edu.ec/handle/43000/1680
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1859094190853455872
author Córdova Montaño, Juan Carlos
author_facet Córdova Montaño, Juan Carlos
author_role author
collection Repositorio Universidad Técnica Estatal de Quevedo
dc.contributor.none.fl_str_mv Zambrano, Carlos Edison
dc.creator.none.fl_str_mv Córdova Montaño, Juan Carlos
dc.date.none.fl_str_mv 2016
2017-03-15T14:27:59Z
2017-03-15T14:27:59Z
dc.format.none.fl_str_mv 113 p.
application/pdf
dc.identifier.none.fl_str_mv Córdova Montaño,Juan Carlos. (2016) Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014. Quevedo. UTEQ. 113 p.
991100129
http://repositorio.uteq.edu.ec/handle/43000/1680
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Quevedo UTEQ
dc.relation.none.fl_str_mv Tesis de Postgrado;T-UTEQ-0004
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica Estatal de Quevedo
instname:Universidad Técnica Estatal de Quevedo
instacron:UTEQ
dc.subject.none.fl_str_mv obras de saneamiento
indicadores
productividad
términos económicos
dc.title.none.fl_str_mv Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/masterThesis
description Assess the impact of a system of quality management in the construction company Razconsa CA, it has determined based on the costs of construction of sanitation, which allow to determine those responsible for indicators to assess parameters field parameters that can be corrected as they happen everyday problems in project implementation, to ensure the productivity of work activities. By introducing Razconsa C.A. a system of quality management, the need for this to interact with programming production costs so that is perfect and complete the evaluation process productivity was evident, considering also that the development of processes running jobs it requires that the assessment be complemented by scheduling execution of the work. This research was necessary to determine and instruct factors management works, framed in the definitions of quality costs and not quality, through its assessment in relation to planning water projects evaluated, so that is established at any stage of the process, nonconformity and to apply adjustments to the programming of projects. This form has been developed for each instance of the process of quality control, cost analysis based on indicators that allow the evaluation of quality costs when an item of construction is well executed, and the same way with costs no quality if the items present attributable to faulty construction, poor execution of a process, rejection by a technical process is not executed considering possible severance payments, costs attributable to legal proceedings and permissions problems errors, and analysis non-tangible costs for poor quality. With cost analysis, total quality indicators of service performance waterworks running Razconsa CA. are determined, the same that determine results that are coupled to the reality of the implemented system and identifies weaknesses in its implementation, in its application and valuation in economic terms.
eu_rights_str_mv openAccess
format masterThesis
id UTEQ_00fa7ad85e094ddf508e7cbfcbaf31c3
identifier_str_mv Córdova Montaño,Juan Carlos. (2016) Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014. Quevedo. UTEQ. 113 p.
991100129
instacron_str UTEQ
institution UTEQ
instname_str Universidad Técnica Estatal de Quevedo
language spa
network_acronym_str UTEQ
network_name_str Repositorio Universidad Técnica Estatal de Quevedo
oai_identifier_str oai:repositorio.uteq.edu.ec:43000/1680
publishDate 2016
publisher.none.fl_str_mv Quevedo UTEQ
reponame_str Repositorio Universidad Técnica Estatal de Quevedo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica Estatal de Quevedo - Universidad Técnica Estatal de Quevedo
repository_id_str .
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.Córdova Montaño, Juan Carlosobras de saneamientoindicadoresproductividadtérminos económicosAssess the impact of a system of quality management in the construction company Razconsa CA, it has determined based on the costs of construction of sanitation, which allow to determine those responsible for indicators to assess parameters field parameters that can be corrected as they happen everyday problems in project implementation, to ensure the productivity of work activities. By introducing Razconsa C.A. a system of quality management, the need for this to interact with programming production costs so that is perfect and complete the evaluation process productivity was evident, considering also that the development of processes running jobs it requires that the assessment be complemented by scheduling execution of the work. This research was necessary to determine and instruct factors management works, framed in the definitions of quality costs and not quality, through its assessment in relation to planning water projects evaluated, so that is established at any stage of the process, nonconformity and to apply adjustments to the programming of projects. This form has been developed for each instance of the process of quality control, cost analysis based on indicators that allow the evaluation of quality costs when an item of construction is well executed, and the same way with costs no quality if the items present attributable to faulty construction, poor execution of a process, rejection by a technical process is not executed considering possible severance payments, costs attributable to legal proceedings and permissions problems errors, and analysis non-tangible costs for poor quality. With cost analysis, total quality indicators of service performance waterworks running Razconsa CA. are determined, the same that determine results that are coupled to the reality of the implemented system and identifies weaknesses in its implementation, in its application and valuation in economic terms.Evaluar la incidencia de un sistema de gestión de calidad en la compañía de construcción Razconsa C.A., ha determinado parámetros basados en los costos de la construcción de obras de saneamiento, mismos que permiten determinar a los responsables de campo indicadores que evalúen parámetros que pueden ser corregidos a medida que suceden problemas cotidianos en la ejecución de los proyectos, a fin de asegurar la productividad de las actividades de obra. Al introducir en Razconsa C.A. un sistema de gestión de calidad, se evidenció la necesidad de que este interactúe con la programación de costos de producción a fin de que se perfeccione y complete el proceso de evaluación de la productividad, considerando también que el desarrollo de los procesos de ejecución de trabajos se requiere que la valoración se complemente con la programación de ejecución de los trabajos. En esta investigación fue necesario, determinar e instruir factores de la administración de obras, enmarcados en las definiciones de los costos de calidad y no calidad, pasando por su valoración en relación a la planificación de los proyectos de agua potable evaluados, de tal forma que se establezca en cualquier instancia de los procesos, las no conformidades y poder aplicar ajustes correspondientes a la programación de los proyectos. de esta forma se ha desarrollado para cada instancia de los procesos de control de calidad, análisis de costos basados en indicadores que permiten la evaluación de los costos de calidad cuando un rubro de construcción está bien ejecutado, y de la misma forma con los costos de no calidad en el caso de que los rubros presente errores imputables a fallos de construcción, mala ejecución de un proceso, rechazo por un proceso técnico no ejecutado considerando posibles pagos de indemnizaciones, costos de problemas imputables a procesos legales y permisos, y el análisis de los costos no tangibles por mala calidad. Con el análisis de costos, se determinan los indicadores totales de la calidad del servicio de ejecución de obras sanitarias que ejecuta Razconsa C.A., los mismos que determinan resultados que se acoplan a la realidad del sistema implementado e identifica las falencias en su implementación, en su aplicación y en la valoración en términos económicos.Quevedo UTEQZambrano, Carlos Edison2017-03-15T14:27:59Z2017-03-15T14:27:59Z2016info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis113 p.application/pdfCórdova Montaño,Juan Carlos. (2016) Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014. Quevedo. UTEQ. 113 p.991100129http://repositorio.uteq.edu.ec/handle/43000/1680spaTesis de Postgrado;T-UTEQ-0004http://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica Estatal de Quevedoinstname:Universidad Técnica Estatal de Quevedoinstacron:UTEQ2023-07-02T03:23:55Zoai:repositorio.uteq.edu.ec:43000/1680Institucionalhttp://repositorio.uteq.edu.ec/Universidad públicahttps://www.uteq.edu.ec/http://repositorio.uteq.edu.ec/oaiEcuador...opendoar:.2023-07-02T03:23:55falseInstitucionalhttp://repositorio.uteq.edu.ec/Universidad públicahttps://www.uteq.edu.ec/http://repositorio.uteq.edu.ec/oai.Ecuador...opendoar:.2023-07-02T03:23:55Repositorio Universidad Técnica Estatal de Quevedo - Universidad Técnica Estatal de Quevedofalse
spellingShingle Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
Córdova Montaño, Juan Carlos
obras de saneamiento
indicadores
productividad
términos económicos
status_str publishedVersion
title Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
title_full Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
title_fullStr Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
title_full_unstemmed Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
title_short Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
title_sort Gestión de calidad y su incidencia en los costos operativos de Proyectos de desarrollo y saneamiento de la constructora Razconsa C.A. de Esmeraldas, Periodo 2013 – 2014.
topic obras de saneamiento
indicadores
productividad
términos económicos
url http://repositorio.uteq.edu.ec/handle/43000/1680