Plan de inversión para mejoramiento con responsabilidad social - empresarial de “avícola villares”, parroquia San Carlos, año 2014 – 2015
Thais research titled investment PLAN FOR IMPROVEMENT WITH CORPORATE SOCIAL RESPOSIBILITY OF POULTRY VILLARES PARISH SAN CARLOS YEAR 2014 – 2015, WAS HELD IN THE PARIS SAB CARLOS CANTON QUEVEDO, of the Rios province, with a geographical location 1°27´0” south latitude and 78°28´12” west longitude, l...
Guardado en:
| Autor principal: | |
|---|---|
| Formato: | bachelorThesis |
| Lenguaje: | spa |
| Publicado: |
2015
|
| Materias: | |
| Acceso en línea: | http://repositorio.uteq.edu.ec/handle/43000/364 |
| Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
| Sumario: | Thais research titled investment PLAN FOR IMPROVEMENT WITH CORPORATE SOCIAL RESPOSIBILITY OF POULTRY VILLARES PARISH SAN CARLOS YEAR 2014 – 2015, WAS HELD IN THE PARIS SAB CARLOS CANTON QUEVEDO, of the Rios province, with a geographical location 1°27´0” south latitude and 78°28´12” west longitude, located 75 M.SN.M. With a durations of 180 days. Within the research process business information and information on the consumption level was obtained for this research field was applied and bibliographic facilitating the application of the technique of direct observation allowed us the same as the data collection.The research methods applied were the same deductive – inductive method allowed us to discover how to implement the survey was applied analytical method that helped us to perform critical analysis and examine the current situation of poultry Villares of the parish San Carlos; Descriptive method that helped us particularize the processes carried out for the preparation of draft inversion. For the data collection survey technique was applied to a sample 18 people and interview the administrator, accountant and head of production.The Villares poultry farms has 6 in the parish san Carlos and 1 in the parish san Camilo, which produce 264.900 chicks BB year. The Villares poultry not done with planning investments, since it has been shopped by the needs that a rise whereby an investment of 33.226.32 dollars was performed, as currently has a production having 80%, 50 it is expected to reach 100% of these investments |
|---|