Factibilidad para la creación de una oficina técnica forestal en el aserradero el campeón
The present study of feasibility of a forestry technical Office, was carried out in the middle of the Canton in Quevedo, Los Ríos province, at an altitude ranging from 70 to 73 m.a.s.l. The results were: determined agricultural entities requiring forest seedlings, which protrudes 96,08% of the deman...
Na minha lista:
Autor principal: | |
---|---|
Outros Autores: | |
Formato: | bachelorThesis |
Idioma: | spa |
Publicado em: |
2012
|
Assuntos: | |
Acesso em linha: | http://repositorio.uteq.edu.ec/handle/43000/4955 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
Resumo: | The present study of feasibility of a forestry technical Office, was carried out in the middle of the Canton in Quevedo, Los Ríos province, at an altitude ranging from 70 to 73 m.a.s.l. The results were: determined agricultural entities requiring forest seedlings, which protrudes 96,08% of the demand corresponds to and farmers in the area. Seven (7) companies that offer wood in the area, two of them was determined with respect to the offer, (67,67%) is in the market for three years. The characteristics of the wood they produce were determined that six of these (66.67%) sold wood for cabinetmakers and carpenters and just one (33.33%) sold to timber companies. Fixed investment in tangible fixed assets and fixed assets intangible assets, the same that amounts to the amount of 30808,40 dollars. The capital of operation for the three first months of operation ascends to the amount of 8249.10 dollars. For the operativity of the project 50% that is to say, 32,953 will be contributed with equity capital, 75 dollars and for the rest it anticipates a hypothecating credit to 3 years terms in a banking organization of the locality. The costs that will take place in the operativity of the project, for their greater control we have divided the costs of operation in fixed costs which they oscillate in $21.547, 16 and the variables in $ 18,476, 40. The budget of income by concept of annual sales ascends to the amount of $ 50085.00, for the first year. The net utility after to discount to all the costs and expenses that incur every year of life utility of project For the first year utility it is of $ -2,655, the 65 flow of box generated for the first year is 4,834, 44 dollars. The level of monetary balance of the first year is of $ 21,546, 79; the production of plántulas minimum is 61,562 plants. The relation benefit cost gave like result 2,67. The internal rate of return is 21, which is superior to the interest rate of the market. VAN also presented/displayed a positive value what means the updated liquid return generated by the project |
---|