Estudio de factibilidad para la creación de una empresa de fundición de aluminio, cantón Quevedo, año 2014

The following paper aims to conduct a feasibility study for the establishment of an aluminum smelter in the canton Quevedo 2014. It was carried out a survey, taking into account the inhabitants of the canton Quevedo and was applied on a probability sample. The population was stratified according to...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijä: Saltos Ordoñez, Herlinda Raquel (author)
Aineistotyyppi: bachelorThesis
Kieli:spa
Julkaistu: 2015
Aiheet:
Linkit:http://repositorio.uteq.edu.ec/handle/43000/894
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!
Kuvaus
Yhteenveto:The following paper aims to conduct a feasibility study for the establishment of an aluminum smelter in the canton Quevedo 2014. It was carried out a survey, taking into account the inhabitants of the canton Quevedo and was applied on a probability sample. The population was stratified according to the element key socio-economic situation in determining the objectives. That is why this research is to create the company so that in this way the recycled aluminum takes advantage and turn it into useful kitchen utensils for the use of people, creating jobs and a new alternative to increase their income. For the project , containing the problem statement diagnosing the casting is the process of producing a metal object by casting a molten metal into a mold and then is cooled and solidified , through this research is to determine how feasible is the creation of an aluminum foundry in canton Quevedo 2014, establishing the market study to analyze the technical study and carry out the financial analysis of the company , and thus the conclusions and recommendations were determined. The initial investment is $ 45,000.00 which is 7% Equity $ 3,150 while 93 % will be funded by the National Development Bank or $ 41.850 five-year term and an interest rate of 10% annual internal rate of return of 22% and the net present value of the investment is $ 7.073.00 with a benefit cost ratio of $ 1.27recovery time of the investment is 5 years, 3 month and 18days which indicates that the project is profitable.