Implementación del plan de mantenimiento para el tratamiento de aguas residuales en la producción de puré de banano y flake en la empresa futurcorp s.a, en el Cantón Pueblo Viejo, año 2016

This project implementation maintenance plan for wastewater treatment in the production of mashed bananas and flake was held in the company FUTURCORP SA canton old town, establishing analyze current system conditions wastewater treatment company food, determine the technical condition of the equipme...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoir: Dume López, Merlín Lenin (author)
Formáid: bachelorThesis
Teanga:spa
Foilsithe / Cruthaithe: 2016
Ábhair:
Rochtain ar líne:http://repositorio.uteq.edu.ec/handle/43000/1855
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
Cur síos
Achoimre:This project implementation maintenance plan for wastewater treatment in the production of mashed bananas and flake was held in the company FUTURCORP SA canton old town, establishing analyze current system conditions wastewater treatment company food, determine the technical condition of the equipment and structures, propose corrective measures for this system and implement a maintenance plan for the sewage system. After making the characterization of this system it was determined that there are no records or procedures for operation of this system water treatment or emergency measures for reducing the consumption of raw water used in the extraction areas and cleaning process in general Company Moreover the structures and equipment of the system are in poor states the same that prevent its operation and testing of industrial wastewater is discharged directly into the river old town without any treatment without being able to establish the pollution load of this, and if the parameters they are framed in accordance with current environmental regulations.