Implementación del plan de mantenimiento para el tratamiento de aguas residuales en la producción de puré de banano y flake en la empresa futurcorp s.a, en el Cantón Pueblo Viejo, año 2016

This project implementation maintenance plan for wastewater treatment in the production of mashed bananas and flake was held in the company FUTURCORP SA canton old town, establishing analyze current system conditions wastewater treatment company food, determine the technical condition of the equipme...

Full description

Saved in:
Bibliographic Details
Main Author: Dume López, Merlín Lenin (author)
Format: bachelorThesis
Language:spa
Published: 2016
Subjects:
Online Access:http://repositorio.uteq.edu.ec/handle/43000/1855
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items