Sistema administrativo de logística y su impacto en la eficiencia y eficacia del proyecto poliducto pascuales - Cuenca, periodo 2013-20147, propuesta de rediseño de gestión Logística.

The research process was conducted in the Brazilian company Odebrecht, which signed a contract for the construction of the pipeline Pascuales Cuenca which will run between the port city of Guayaquil to Cuenca, capital of the province of Azuay. The research is based on determining the affects the adm...

全面介紹

Saved in:
書目詳細資料
主要作者: Figueroa Tuarez, Clara Monserrate (author)
格式: masterThesis
語言:spa
出版: 2015
主題:
在線閱讀:http://repositorio.uteq.edu.ec/handle/43000/5763
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:The research process was conducted in the Brazilian company Odebrecht, which signed a contract for the construction of the pipeline Pascuales Cuenca which will run between the port city of Guayaquil to Cuenca, capital of the province of Azuay. The research is based on determining the affects the administrative system of logistics and its impact on the efficiency and effectiveness of the Pipeline Project Pascuales – Cuenca.The results were expressed that 30% of respondents agree that if fulfills activities under the administrative procedures and logistics systems; regarding the quality of materials 66% believe that there is no review of the quality of the materials acquired through the area giving rise to partial fulfillment of the required specifications. T