“Propuesta de distribución de planta y mejoramiento de la producción en la empresa Induhorst Cía Ltda del cantón Quevedo”
Research on the proposal for plant distribution and production improvement was carried out at INDUHORST, plant redistribution was carried out in order to improve production processes while reducing production times. In carrying out the research, objectives were raised in order to redistribute the ar...
Αποθηκεύτηκε σε:
| Κύριος συγγραφέας: | |
|---|---|
| Μορφή: | masterThesis |
| Γλώσσα: | spa |
| Έκδοση: |
2020
|
| Θέματα: | |
| Διαθέσιμο Online: | http://repositorio.uteq.edu.ec/handle/43000/5937 |
| Ετικέτες: |
Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
|
| Περίληψη: | Research on the proposal for plant distribution and production improvement was carried out at INDUHORST, plant redistribution was carried out in order to improve production processes while reducing production times. In carrying out the research, objectives were raised in order to redistribute the areas according to the production line of the company, the current analysis of the machines, equipment, operators and other materials involved in the manufacturing process of the rice ageing was made, for this purpose flow diagrams, route diagrams and the current distribution of the company was made which shows the status of the machinery involved in the manufacture of the rice ageing machine. Therefore, the bottleneck that generates downtime in the manufacturing process was established, to establish the bottleneck the pert diagram was used by calculating the critical route which defines the area of greatest time in the manufacture of the rice ageing machine. In the redistribution between areas, the Systematic Layout Planning (SLP) methodology was used, which presents a systematic model that is being fulfilled step by step resulting in a redistribution that seeks to reorder spaces necessary for the movement of material, equipment and more materials that are required in the manufacture of the rice ageing machine. Keywords: Manufacturing time, plant distribution, process optimization, fixed position distribution, Corelap, Systematic Layout Planning. |
|---|