Sistema de producción basado en la planificación de requerimiento de materiales (mrp) en la Empresa de Muebles de Madera “Álvarez” del cantón Santo Domingo
The present research project was carried out in the wooden furniture company "Álvarez", located in Santo Domingo canton, Province of Santo Domingo de Los Tsáchilas, the same one that aims to implement a material requirements planning system, for this, annual sales were identified, in which...
Saved in:
| Main Author: | Urrutia Vargas, Paúl Eduardo (author) |
|---|---|
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://repositorio.uteq.edu.ec/handle/43000/3716 |
| Tags: |
No Tags, Be the first to tag this record!
|
Similar Items
-
Sistema de planificación de requerimiento de materiales (MRP), para la gestión de ventas, administración y publicidad de la empresa S-Repintor de la ciudad de Santo Domingo
by: Acosta Yanez, Joselyn Alejandra
Published: (2019) -
Modelo de Planificación de Requerimiento de Materiales (MRP), caso aplicado: Laboratorios Paracelso.
by: Abad Farfán, Pablo Andrés
Published: (2023) -
Diseño de un plan de requerimiento de materiales de la empresa Chiripa Snacks, ubicada al norte de Quito
by: Rodriguez Ponce, Francisco Alejandro
Published: (2023) -
Plan de implementación de MRP (Planificación de Requerimiento de Materiales) en una empresa de manufactura de productos de consumo masivo caso: Quala Ecuador S.A.
by: Álvarez Peralta, Darwin Enrique
Published: (2011) -
Diseño de un modelo de gestión demand driven – mrp, para el aprovisionamiento de productos aceites y lubricantes aéreos para una flota de aviones supersónicos
by: Espol
Published: (2019)