“Diseño geométrico, estructural y drenaje pluvial de las calles vehiculares de las lotizaciones: sindicato de choferes y san francisco, pertenecientes al cantón arenillas provincia de el oro, año 2014,”

The streets of the lotizaciones: Drivers Union and San Francisco are not in optimal conditions, which generates economic output loss products. For this reason, the project's main objective is to perform the geometric design, structural and storm drainage of vehicular streets lotizaciones: Drive...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Chamba Romero, José Vinicio (author)
Format: bachelorThesis
Sprache:spa
Veröffentlicht: 2015
Schlagworte:
Online Zugang:http://repositorio.utmachala.edu.ec/handle/48000/5977
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The streets of the lotizaciones: Drivers Union and San Francisco are not in optimal conditions, which generates economic output loss products. For this reason, the project's main objective is to perform the geometric design, structural and storm drainage of vehicular streets lotizaciones: Drivers Union and San Francisco, belonging to the Canton Arenillas province of Gold, The research conducted in this project was using the form of consultations on websites, bibliographic research and field work. It based on studies of traffic count design speed, soil studies and the pavement structure was determined it conducted with AASTHO -93 standard, the geometric layout is hiso with the architecture and urbanism of Ecuador norm and INEN, the environmental impact hiso under the rule of MTOP The routes are III project order with low traffic and a design speed of 40 km / h, with a length of 4496.50 m. carriageway width 7.30 m and 5.60 m, 0.60 m ditches, curb 0.20 m high and 0.15 m wide. by order of the municipality in the storm drain pipe to the drain ø250 mm and Ø300 mm H ° the main collector is placed, the total cost of the project reached an amount of $ 1,681,202.89. The environmental impact is of low magnitude for this project.