Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado

In the present investigation we analyzed the methodology for the control of costs in processes of smaller quantity of works applying the technique of value gained in construction projects, where we analyzed the main aspects of the indices that influence in the control of costs applying (CVI, EAC, EA...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Palacios Tacuri, Verónica Alexandra (author)
Format: masterThesis
Veröffentlicht: 2017
Schlagworte:
Online Zugang:http://repositorio.utmachala.edu.ec/handle/48000/10728
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1847605049575866368
author Palacios Tacuri, Verónica Alexandra
author_facet Palacios Tacuri, Verónica Alexandra
author_role author
collection Repositorio Universidad Técnica de Machala
dc.contributor.none.fl_str_mv Medina Sánchez, Yudy Patricia
dc.creator.none.fl_str_mv Palacios Tacuri, Verónica Alexandra
dc.date.none.fl_str_mv 2017-08-14T21:14:12Z
2017-08-14T21:14:12Z
2017-08-09
dc.format.none.fl_str_mv 63 p.
application/pdf
dc.identifier.none.fl_str_mv Verónica Alexandra P. T. (2017) Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado. (Tesis de Magister) UTMACH, Unidad Académica Ingeniería Civil, Machala, Ecuador
TMUAIC_2017_GC_CD034
http://repositorio.utmachala.edu.ec/handle/48000/10728
dc.language.none.fl_str_mv es
dc.publisher.none.fl_str_mv Machala
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Machala
instname:Universidad Técnica de Machala
instacron:UTMACH
dc.subject.none.fl_str_mv METODOLOGÍA CONTROL DE COSTOS, TÉCNICA DEL VALOR GANADO,
PROCESOS DE MENOR CUANTÍA DE OBRAS.
dc.title.none.fl_str_mv Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/masterThesis
description In the present investigation we analyzed the methodology for the control of costs in processes of smaller quantity of works applying the technique of value gained in construction projects, where we analyzed the main aspects of the indices that influence in the control of costs applying (CVI, EAC, EAC, VAC), and the indicators of cost projections (TCP, ETC, EAC, VAC), and, Thus avoiding cost overruns due to the inadequate control of the changes that occur in the base line of costs of the smallest processes. The main objective of the investigation was to determine a cost control methodology in the process of lower amounts of works by applying the Value of Lives technique to identify the variations between the budget planned and executed through the application of A research of a qualitative type that consisted in the bibliographical - documentary revision of terms related to the research topic; We studied theories of authors of scientific journals that allowed to expand the knowledge on the control of costs through the technique of value gained in civil works. Finally, it culminates with the proposal of a methodology for controlling costs in the process of lower quantity of works applying the technique of earned value, the same that consisted in the development of a flow chart that gives the necessary steps that contractors and others Persons who carry out civil works must continue to control costs in smaller adjudicated processes and determine whether they should carry out preventive or corrective measures based on the interpretation of the indicators of the value-for-money technique, and then make the conclusions and recommendations of the investigation
eu_rights_str_mv openAccess
format masterThesis
id UTMACH_a699f2d6cd259ddf8e5cb2c04815f04d
identifier_str_mv Verónica Alexandra P. T. (2017) Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado. (Tesis de Magister) UTMACH, Unidad Académica Ingeniería Civil, Machala, Ecuador
TMUAIC_2017_GC_CD034
instacron_str UTMACH
institution UTMACH
instname_str Universidad Técnica de Machala
language_invalid_str_mv es
network_acronym_str UTMACH
network_name_str Repositorio Universidad Técnica de Machala
oai_identifier_str oai:http://repositorio.utmachala.edu.ec:48000/10728
publishDate 2017
publisher.none.fl_str_mv Machala
reponame_str Repositorio Universidad Técnica de Machala
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Machala - Universidad Técnica de Machala
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganadoPalacios Tacuri, Verónica AlexandraMETODOLOGÍA CONTROL DE COSTOS, TÉCNICA DEL VALOR GANADO,PROCESOS DE MENOR CUANTÍA DE OBRAS.In the present investigation we analyzed the methodology for the control of costs in processes of smaller quantity of works applying the technique of value gained in construction projects, where we analyzed the main aspects of the indices that influence in the control of costs applying (CVI, EAC, EAC, VAC), and the indicators of cost projections (TCP, ETC, EAC, VAC), and, Thus avoiding cost overruns due to the inadequate control of the changes that occur in the base line of costs of the smallest processes. The main objective of the investigation was to determine a cost control methodology in the process of lower amounts of works by applying the Value of Lives technique to identify the variations between the budget planned and executed through the application of A research of a qualitative type that consisted in the bibliographical - documentary revision of terms related to the research topic; We studied theories of authors of scientific journals that allowed to expand the knowledge on the control of costs through the technique of value gained in civil works. Finally, it culminates with the proposal of a methodology for controlling costs in the process of lower quantity of works applying the technique of earned value, the same that consisted in the development of a flow chart that gives the necessary steps that contractors and others Persons who carry out civil works must continue to control costs in smaller adjudicated processes and determine whether they should carry out preventive or corrective measures based on the interpretation of the indicators of the value-for-money technique, and then make the conclusions and recommendations of the investigationEn la presente investigación se analizó sobre la metodología para el control de costos en procesos de menor cuantía de obras aplicando la técnica del valor ganado en proyectos de construcción, en donde se analizaron los principales aspectos de los índices que influyen en el control de costos aplicando la técnica del valor ganado, los mismos que son: indicadores de variaciones (CV, SV), índices de desempeño (CPI, SPI, CSI), y los indicadores de proyecciones de costos (TCPI, ETC, EAC, VAC), y, así evitar sobrecostos por el inadecuado control de los cambios que se producen en la línea base de costos de los procesos de menor cuantía. Se cumplió con el principal objetivo de la investigación que consistió en determinar una metodología de control de costos en procesos de menor cuantía de obras aplicando la Técnica del Valor Ganado para la identificación de las variaciones entre el presupuesto planificado y ejecutado a través de la aplicación de una investigación de tipo cualitativa que consistió en la revisión bibliográfica – documental de términos relacionados con el tema de investigación; se estudiaron teorías de autores de revistas científicas que permitieron ampliar el conocimiento sobre el control de costos a través de la técnica de valor ganado en obras civiles. Finalmente se culmina con la propuesta de una metodología para el control de costos en proceso de menor cuantía de obras aplicando la técnica del valor ganado, la misma que consistió en el desarrollo de un diagrama de flujo que da los pasos necesarios que los contratistas y demás personas que ejecuten obras civiles deben seguir para el control de costos en procesos adjudicados de menor cuantía y determinar si debe realizar medidas preventivas o correctivas en base a la interpretación de los indicadores de la técnica del valor ganado, posteriormente se realizan las conclusiones y recomendaciones de la investigación.MachalaMedina Sánchez, Yudy Patricia2017-08-14T21:14:12Z2017-08-14T21:14:12Z2017-08-09info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis63 p.application/pdfVerónica Alexandra P. T. (2017) Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado. (Tesis de Magister) UTMACH, Unidad Académica Ingeniería Civil, Machala, EcuadorTMUAIC_2017_GC_CD034http://repositorio.utmachala.edu.ec/handle/48000/10728eshttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Machalainstname:Universidad Técnica de Machalainstacron:UTMACH2017-08-15T08:02:35Zoai:http://repositorio.utmachala.edu.ec:48000/10728Institucionalhttp://repositorio.utmachala.edu.ec/Universidad públicahttps://www.utmachala.edu.ec/http://repositorio.utmachala.edu.ec/oai.Ecuador...opendoar:02017-08-15T08:02:35Repositorio Universidad Técnica de Machala - Universidad Técnica de Machalafalse
spellingShingle Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
Palacios Tacuri, Verónica Alexandra
METODOLOGÍA CONTROL DE COSTOS, TÉCNICA DEL VALOR GANADO,
PROCESOS DE MENOR CUANTÍA DE OBRAS.
status_str publishedVersion
title Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
title_full Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
title_fullStr Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
title_full_unstemmed Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
title_short Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
title_sort Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
topic METODOLOGÍA CONTROL DE COSTOS, TÉCNICA DEL VALOR GANADO,
PROCESOS DE MENOR CUANTÍA DE OBRAS.
url http://repositorio.utmachala.edu.ec/handle/48000/10728