Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado

In the present investigation we analyzed the methodology for the control of costs in processes of smaller quantity of works applying the technique of value gained in construction projects, where we analyzed the main aspects of the indices that influence in the control of costs applying (CVI, EAC, EA...

Full description

Saved in:
Bibliographic Details
Main Author: Palacios Tacuri, Verónica Alexandra (author)
Format: masterThesis
Published: 2017
Subjects:
Online Access:http://repositorio.utmachala.edu.ec/handle/48000/10728
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items