Estudios y diseños de la vía sitio Atahualpa - Sambotambo, ubicado en la parroquia Moromoro, provincia de El Oro.
The Sambotambo site of the parish Ayapamba, Atahualpa Canton is connected to the site known as Atahualpa in Moromoro parish, through a path of existing horseshoe is in a precarious state for which there is no public transport. The objective of this project is to determine the technical studies and...
Wedi'i Gadw mewn:
| Prif Awdur: | |
|---|---|
| Fformat: | bachelorThesis |
| Iaith: | spa |
| Cyhoeddwyd: |
2015
|
| Pynciau: | |
| Mynediad Ar-lein: | http://repositorio.utmachala.edu.ec/handle/48000/5954 |
| Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|
| Crynodeb: | The Sambotambo site of the parish Ayapamba, Atahualpa Canton is connected to the site known as Atahualpa in Moromoro parish, through a path of existing horseshoe is in a precarious state for which there is no public transport. The objective of this project is to determine the technical studies and designs feasible the Atahualpa road - Sambotambo, located in the Moromoro, Province of El Oro, Parish to optimize communication, trade and access to basic services lacking the study area The methodology of this project integrates the use of professional methods by Engineering Studies techniques and instruments "field observations, geotechnics, bibliographic signing", internet and design standards used MTOP. Project studies resulted in a pathway IV ORDER and vertical curves with minimal outstanding 3.85% and maximum of 12.01%, the design speed is 40 km / h with a length of 5 + 156.72 m, obtaining 71 circular curves, 14 vertical curves. |
|---|