Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Na minha lista:
| Autor principal: | |
|---|---|
| Formato: | article |
| Idioma: | spa |
| Publicado em: |
2010
|
| Assuntos: | |
| Acesso em linha: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|