Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Córdova Guerra, María Auxiliadora (author)
Format: article
Sprache:spa
Veröffentlicht: 2010
Schlagworte:
Online Zugang:http://www.dspace.espol.edu.ec/handle/123456789/13305
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1858337422525333504
author Córdova Guerra, María Auxiliadora
author_facet Córdova Guerra, María Auxiliadora
author_role author
collection Repositorio Escuela Superior Politécnica del Litoral
dc.creator.none.fl_str_mv Córdova Guerra, María Auxiliadora
dc.date.none.fl_str_mv 2010-10-11
2010-10-11
2010-10-11
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://www.dspace.espol.edu.ec/handle/123456789/13305
dc.language.none.fl_str_mv spa
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Escuela Superior Politécnica del Litoral
instname:Escuela Superior Politécnica del Litoral
instacron:ESPOL
dc.subject.none.fl_str_mv DIAGNÓSTICO ENERGÉTICO FASE DOS
DIAGNÓSTICO POR PROCESOS
AMFE
TIEMPO DE RECUPERACIÓN
RETORNO DE LA INVERSIÓN.
dc.title.none.fl_str_mv Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/article
description This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we identify the opportunities of improvements, presenting the relevant characteristics of the facilities, considering production, processes and electrical consumption factors. Such information is used to determine the energy indexes by production kilo. The tools used for this procedure were the energetic diagnosis (phase two), diagnosis by processes, FMEA, simple recovery time and return on investment. Different saving potentialities were identified: illumination at production and administration areas, power control for dryers, implementation of control sheets for molds changes and ventilation system. The savings determined if the proposal is to be implemented rise up to 16,615 USD, compared to an investment of 6,785 USD, which will be recovered in a 5 months period. The technical evaluation of the implementation determined that there existed no barrier to its accomplishment
eu_rights_str_mv openAccess
format article
id ESPOL_7aa8ea74e564ee6b5e15b64c82d0f884
instacron_str ESPOL
institution ESPOL
instname_str Escuela Superior Politécnica del Litoral
language spa
network_acronym_str ESPOL
network_name_str Repositorio Escuela Superior Politécnica del Litoral
oai_identifier_str oai:www.dspace.espol.edu.ec:123456789/13305
publishDate 2010
reponame_str Repositorio Escuela Superior Politécnica del Litoral
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Escuela Superior Politécnica del Litoral - Escuela Superior Politécnica del Litoral
repository_id_str 1479
spelling Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajoCórdova Guerra, María AuxiliadoraDIAGNÓSTICO ENERGÉTICO FASE DOSDIAGNÓSTICO POR PROCESOSAMFETIEMPO DE RECUPERACIÓNRETORNO DE LA INVERSIÓN.This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we identify the opportunities of improvements, presenting the relevant characteristics of the facilities, considering production, processes and electrical consumption factors. Such information is used to determine the energy indexes by production kilo. The tools used for this procedure were the energetic diagnosis (phase two), diagnosis by processes, FMEA, simple recovery time and return on investment. Different saving potentialities were identified: illumination at production and administration areas, power control for dryers, implementation of control sheets for molds changes and ventilation system. The savings determined if the proposal is to be implemented rise up to 16,615 USD, compared to an investment of 6,785 USD, which will be recovered in a 5 months period. The technical evaluation of the implementation determined that there existed no barrier to its accomplishment2010-10-112010-10-112010-10-11info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfhttp://www.dspace.espol.edu.ec/handle/123456789/13305spainfo:eu-repo/semantics/openAccessreponame:Repositorio Escuela Superior Politécnica del Litoralinstname:Escuela Superior Politécnica del Litoralinstacron:ESPOL2010-10-11T14:49:12Zoai:www.dspace.espol.edu.ec:123456789/13305Institucionalhttps://www.dspace.espol.edu.ec/Universidad públicahttps://www.espol.edu.ec/.https://www.dspace.espol.edu.ec/oaiEcuador...opendoar:14792010-10-11T14:49:12falseInstitucionalhttps://www.dspace.espol.edu.ec/Universidad públicahttps://www.espol.edu.ec/.https://www.dspace.espol.edu.ec/oai.Ecuador...opendoar:14792010-10-11T14:49:12Repositorio Escuela Superior Politécnica del Litoral - Escuela Superior Politécnica del Litoralfalse
spellingShingle Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
Córdova Guerra, María Auxiliadora
DIAGNÓSTICO ENERGÉTICO FASE DOS
DIAGNÓSTICO POR PROCESOS
AMFE
TIEMPO DE RECUPERACIÓN
RETORNO DE LA INVERSIÓN.
status_str publishedVersion
title Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
title_full Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
title_fullStr Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
title_full_unstemmed Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
title_short Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
title_sort Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
topic DIAGNÓSTICO ENERGÉTICO FASE DOS
DIAGNÓSTICO POR PROCESOS
AMFE
TIEMPO DE RECUPERACIÓN
RETORNO DE LA INVERSIÓN.
url http://www.dspace.espol.edu.ec/handle/123456789/13305