Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
में बचाया:
| मुख्य लेखक: | |
|---|---|
| स्वरूप: | article |
| भाषा: | spa |
| प्रकाशित: |
2010
|
| विषय: | |
| ऑनलाइन पहुंच: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
| टैग: |
टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
|