Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Uloženo v:
Hlavní autor: | |
---|---|
Médium: | article |
Jazyk: | spa |
Vydáno: |
2010
|
Témata: | |
On-line přístup: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|