Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autor: Córdova Guerra, María Auxiliadora (author)
Médium: article
Jazyk:spa
Vydáno: 2010
Témata:
On-line přístup:http://www.dspace.espol.edu.ec/handle/123456789/13305
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!