Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Wedi'i Gadw mewn:
Prif Awdur: | |
---|---|
Fformat: | article |
Iaith: | spa |
Cyhoeddwyd: |
2010
|
Pynciau: | |
Mynediad Ar-lein: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|