Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | article |
Sprache: | spa |
Veröffentlicht: |
2010
|
Schlagworte: | |
Online Zugang: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|