Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Deskribapen osoa

Gorde:
Xehetasun bibliografikoak
Egile nagusia: Córdova Guerra, María Auxiliadora (author)
Formatua: article
Hizkuntza:spa
Argitaratua: 2010
Gaiak:
Sarrera elektronikoa:http://www.dspace.espol.edu.ec/handle/123456789/13305
Etiketak: Etiketa erantsi
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!