Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Gorde:
Egile nagusia: | |
---|---|
Formatua: | article |
Hizkuntza: | spa |
Argitaratua: |
2010
|
Gaiak: | |
Sarrera elektronikoa: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Etiketak: |
Etiketa erantsi
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
|