Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijä: Córdova Guerra, María Auxiliadora (author)
Aineistotyyppi: article
Kieli:spa
Julkaistu: 2010
Aiheet:
Linkit:http://www.dspace.espol.edu.ec/handle/123456789/13305
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!