Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Sábháilte in:
Príomhchruthaitheoir: | |
---|---|
Formáid: | article |
Teanga: | spa |
Foilsithe / Cruthaithe: |
2010
|
Ábhair: | |
Rochtain ar líne: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|