Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Cijeli opis

Spremljeno u:
Bibliografski detalji
Glavni autor: Córdova Guerra, María Auxiliadora (author)
Format: article
Jezik:spa
Izdano: 2010
Teme:
Online pristup:http://www.dspace.espol.edu.ec/handle/123456789/13305
Oznake: Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!