Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

詳細記述

保存先:
書誌詳細
第一著者: Córdova Guerra, María Auxiliadora (author)
フォーマット: article
言語:spa
出版事項: 2010
主題:
オンライン・アクセス:http://www.dspace.espol.edu.ec/handle/123456789/13305
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!