Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Zapisane w:
1. autor: | |
---|---|
Format: | article |
Język: | spa |
Wydane: |
2010
|
Hasła przedmiotowe: | |
Dostęp online: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Etykiety: |
Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
|