Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Córdova Guerra, María Auxiliadora (author)
Formato: article
Idioma:spa
Publicado em: 2010
Assuntos:
Acesso em linha:http://www.dspace.espol.edu.ec/handle/123456789/13305
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!