Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Córdova Guerra, María Auxiliadora (author)
Format: article
Jezik:spa
Izdano: 2010
Teme:
Online dostop:http://www.dspace.espol.edu.ec/handle/123456789/13305
Oznake: Označite
Brez oznak, prvi označite!