Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Sparad:
Huvudupphovsman: | |
---|---|
Materialtyp: | article |
Språk: | spa |
Publicerad: |
2010
|
Ämnen: | |
Länkar: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Taggar: |
Lägg till en tagg
Inga taggar, Lägg till första taggen!
|