Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Full beskrivning

Sparad:
Bibliografiska uppgifter
Huvudupphovsman: Córdova Guerra, María Auxiliadora (author)
Materialtyp: article
Språk:spa
Publicerad: 2010
Ämnen:
Länkar:http://www.dspace.espol.edu.ec/handle/123456789/13305
Taggar: Lägg till en tagg
Inga taggar, Lägg till första taggen!