Estudio de la coordinación de protecciones por métodos computarizados aplicados al sistema eléctrico “la toma (interagua)”
This paper discusses the electrical substation “La Toma (Interagua)”, the load flow study was conducted to determine the electrical current situation system and verify that its elements possess sufficient for normal operation contingency; reservation was made the study of short circuit to meet peak...
Salvato in:
| Autore principale: | |
|---|---|
| Altri autori: | , |
| Natura: | article |
| Lingua: | spa |
| Pubblicazione: |
2009
|
| Soggetti: | |
| Accesso online: | http://www.dspace.espol.edu.ec/handle/123456789/8377 |
| Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
|