Evaluación de tiempos y costos en procesos constructivos con estructuras metálicas empleando metodología BIM: caso PRONACA Quevedo

This thesis evaluates the impact of the Building Information Modeling (BIM ) methodology on optimizing time and costs during the construction processes of steel structures at the PRONACA Quevedo industrial plant. A study was conducted comparing conventional project design and development tactics wit...

Cijeli opis

Spremljeno u:
Bibliografski detalji
Glavni autor: Acebo Saltos, Juseph Antonio (author)
Daljnji autori: Zambrano Aray, Lider Joao (author)
Format: bachelorThesis
Jezik:spa
Izdano: 2025
Teme:
Online pristup:http://repositorio.ulvr.edu.ec/handle/44000/7987
Oznake: Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!