Evaluación de tiempos y costos en procesos constructivos con estructuras metálicas empleando metodología BIM: caso PRONACA Quevedo
This thesis evaluates the impact of the Building Information Modeling (BIM ) methodology on optimizing time and costs during the construction processes of steel structures at the PRONACA Quevedo industrial plant. A study was conducted comparing conventional project design and development tactics wit...
Spremljeno u:
| Glavni autor: | |
|---|---|
| Daljnji autori: | |
| Format: | bachelorThesis |
| Jezik: | spa |
| Izdano: |
2025
|
| Teme: | |
| Online pristup: | http://repositorio.ulvr.edu.ec/handle/44000/7987 |
| Oznake: |
Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!
|