Evaluación de tiempos y costos en procesos constructivos con estructuras metálicas empleando metodología BIM: caso PRONACA Quevedo

This thesis evaluates the impact of the Building Information Modeling (BIM ) methodology on optimizing time and costs during the construction processes of steel structures at the PRONACA Quevedo industrial plant. A study was conducted comparing conventional project design and development tactics wit...

Disgrifiad llawn

Wedi'i Gadw mewn:
Manylion Llyfryddiaeth
Prif Awdur: Acebo Saltos, Juseph Antonio (author)
Awduron Eraill: Zambrano Aray, Lider Joao (author)
Fformat: bachelorThesis
Iaith:spa
Cyhoeddwyd: 2025
Pynciau:
Mynediad Ar-lein:http://repositorio.ulvr.edu.ec/handle/44000/7987
Tagiau: Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!

Eitemau Tebyg