Assessment of BIM-Facility Management for the Potentialization of Sports Infrastructure. Case study
This study assesses the application of the BIM-FM methodology as a tool for managing, analyzing, and optimizing existing sports infrastructure. The Olympic Pool “El Batán” in Quito, Ecuador, was selected as a case study due to its age—over 40 years—and lack of updated technical documentation. A BIM...
Zapisane w:
| 1. autor: | |
|---|---|
| Kolejni autorzy: | |
| Format: | article |
| Język: | eng |
| Wydane: |
2026
|
| Hasła przedmiotowe: | |
| Dostęp online: | https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/8950 |
| Etykiety: |
Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
|